f GeoConferences.ca: Geotechnical challenges associated with the design and construction of the new Champlain Bridge in Montreal
EN FR
GeoConferences.ca

Geotechnical challenges associated with the design and construction of the new Champlain Bridge in Montreal

Riad Diab, Taravat Kashi Ghandi, Louis D'Amours, Jean Tardif

In the proceedings of: GeoVirtual 2020: 73rd Canadian Geotechnical Conference

Please include this code when submitting a data update: GEO2020_214

Access this article:
Canadian Geotechnical Society members can access to this article, along with all other Canadian Geotechnical Conference proceedings, in the Member Area. Conference proceedings are also available in many libraries.

Cite this article:
Diab, Riad, Ghandi, Taravat Kashi, D'Amours, Louis, Tardif, Jean (2020) Geotechnical challenges associated with the design and construction of the new Champlain Bridge in Montreal in GEO2020. Ottawa, Ontario: Canadian Geotechnical Society.

@article{Diab_GEO2020_214, author = Riad Diab, Taravat Kashi Ghandi, Louis D'Amours, Jean Tardif,
title = Geotechnical challenges associated with the design and construction of the new Champlain Bridge in Montreal ,
year = 2020
}