Case Study - Challenges faced in Port Lands Flood Protection and Enabling Infrastructure (PLFPEI) Toronto Project
Charbel Abi-Nahed, Hannah Chessell, David Drago, Jim Hansen, Ali Nasseri-Moghadam
In the proceedings of: GeoVirtual 2020: 73rd Canadian Geotechnical ConferencePlease include this code when submitting a data update: GEO2020_244
Access this article:
Canadian Geotechnical Society members can access to this article, along with all other Canadian Geotechnical Conference proceedings, in the Member Area. Conference proceedings are also available in many libraries.
Cite this article:
Abi-Nahed, Charbel, Chessell, Hannah, Drago, David, Hansen, Jim, Nasseri-Moghadam, Ali (2020) Case Study - Challenges faced in Port Lands Flood Protection and Enabling Infrastructure (PLFPEI) Toronto Project in GEO2020. Ottawa, Ontario: Canadian Geotechnical Society.
@article{Abi-Nahed_GEO2020_244,
author = Charbel Abi-Nahed, Hannah Chessell, David Drago, Jim Hansen, Ali Nasseri-Moghadam,
title = Case Study - Challenges faced in Port Lands Flood Protection and Enabling Infrastructure (PLFPEI) Toronto Project ,
year = 2020
}
title = Case Study - Challenges faced in Port Lands Flood Protection and Enabling Infrastructure (PLFPEI) Toronto Project ,
year = 2020
}