Case Study - Challenges faced in Port Lands Flood Protection and Enabling Infrastructure (PLFPEI) Toronto Project
Charbel Abi-Nahed, Hannah Chessell, David Drago, Jim Hansen, Ali Nasseri-Moghadam
In the proceedings of: GeoVirtual 2020: 73rd Canadian Geotechnical ConferenceABSTRACT: This paper focuses on the installation of a full depth secant pile wall around the perimeter of the area of Work in Port Lands Flood Protection and Enabling Infrastructure (PLFPEI) project immediately east of downtown Toronto. The wall consisting of both structural and non-structural components is designed to serve as groundwater cut-off and facilitate excavation and construction of a naturalized river channel to protect against flooding. Several challenges were faced during construction such as the high water infiltration rate from Lake Ontario leading to concrete placement through the tremie method, the strict verticality requirement for the deep piles resulting from the highly varying bedrock levels, drilling obstructions and void propagation. The complexity of this project from conception to implementation necessitated the employment of numerous measures and techniques required for adequate construction as highlighted in this paper.
Please include this code when submitting a data update: GEO2020_244
Access this article:
Canadian Geotechnical Society members can access to this article, along with all other Canadian Geotechnical Conference proceedings, in the Member Area. Conference proceedings are also available in many libraries.
Cite this article:
Abi-Nahed, Charbel, Chessell, Hannah, Drago, David, Hansen, Jim, Nasseri-Moghadam, Ali (2020) Case Study - Challenges faced in Port Lands Flood Protection and Enabling Infrastructure (PLFPEI) Toronto Project in GEO2020. Ottawa, Ontario: Canadian Geotechnical Society.
@article{Abi-Nahed_GEO2020_244,
author = Charbel Abi-Nahed, Hannah Chessell, David Drago, Jim Hansen, Ali Nasseri-Moghadam,
title = Case Study - Challenges faced in Port Lands Flood Protection and Enabling Infrastructure (PLFPEI) Toronto Project ,
year = 2020
}
title = Case Study - Challenges faced in Port Lands Flood Protection and Enabling Infrastructure (PLFPEI) Toronto Project ,
year = 2020
}