Incorporating Pile Set-Up Capacity in Design of Driven Steel Pipe Piles at Fort Hills
Changyoung Kim
In the proceedings of: GeoVancouver 2016: 69th Canadian Geotechnical ConferenceSession: FOUNDATION DESIGN - II Driven Piles
Please include this code when submitting a data update: GEO2016_3659
Access this article:
Canadian Geotechnical Society members can access to this article, along with all other Canadian Geotechnical Conference proceedings, in the Member Area. Conference proceedings are also available in many libraries.
Cite this article:
Kim, Changyoung (2016) Incorporating Pile Set-Up Capacity in Design of Driven Steel Pipe Piles at Fort Hills in GEO2016. Ottawa, Ontario: Canadian Geotechnical Society.
@article{Kim_GEO2016_3659,
author = Changyoung Kim,
title = Incorporating Pile Set-Up Capacity in Design of Driven Steel Pipe Piles at Fort Hills,
year = 2016
}
title = Incorporating Pile Set-Up Capacity in Design of Driven Steel Pipe Piles at Fort Hills,
year = 2016
}